Searches , social queries for INITIAL OPERATING-CAPABILITY

Search references for INITIAL OPERATING-CAPABILITY. Phrases containing INITIAL OPERATING-CAPABILITY

See searches and references containing INITIAL OPERATING-CAPABILITY!

Searches containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

  • Initial operating capability
  • Military logistics terms

    Initial operating capability or initial operational capability (IOC) is the state achieved when a capability is available in its minimum usefully deployable

    Initial operating capability

    Initial_operating_capability

  • Full operating capability
  • Military logistics term

    operating capability or full operational capability (FOC) is the completion of a development effort. This is usually preceded by an initial operating

    Full operating capability

    Full_operating_capability

  • General Dynamics Ajax
  • Family of British armoured fighting vehicles

    delivered in 2017. Countless delays meant that as of January 2020, initial operating capability was expected in July 2020. Trials were halted over excessive

    General Dynamics Ajax

    General Dynamics Ajax

    General_Dynamics_Ajax

  • Sea Venom (missile)
  • Anti-ship missile

    Anti-Surface Guided Weapon (Heavy)") in the United Kingdom. While initial operating capability had been expected with the Royal Navy in 2022, it was reported

    Sea Venom (missile)

    Sea Venom (missile)

    Sea_Venom_(missile)

  • RIM-174 Standard ERAM
  • US surface-to-air missile

    range of the launching vessels' target illumination radars. Initial operating capability was planned for 2013 and was achieved on 27 November 2013. The

    RIM-174 Standard ERAM

    RIM-174 Standard ERAM

    RIM-174_Standard_ERAM

  • United States Naval Community College
  • in 2019 and began enrolling students in 2021. USNCC reached Initial Operating Capability (IOC) in 2023. USNCC is pursuing accreditation candidate status

    United States Naval Community College

    United States Naval Community College

    United_States_Naval_Community_College

  • Oshkosh P-19R Aircraft Rescue and Fire Fighting vehicle
  • Aircraft Rescue and Fire Fighting (ARFF) vehicle

    Marine Corps in 2013. The first delivery occurred in June 2017, Initial Operating Capability (IOC) followed in February 2018, and in service the P-19R serves

    Oshkosh P-19R Aircraft Rescue and Fire Fighting vehicle

    Oshkosh P-19R Aircraft Rescue and Fire Fighting vehicle

    Oshkosh_P-19R_Aircraft_Rescue_and_Fire_Fighting_vehicle

  • Lightweight Multirole Missile
  • Laser-guided battlefield missile (ASM, AAM, SAM and SSM)

    Defence (MoD) placed an initial order for 1,000 missiles with deliveries due to start in 2013. However, initial operating capability was considerably delayed

    Lightweight Multirole Missile

    Lightweight Multirole Missile

    Lightweight_Multirole_Missile

  • Next Generation Jammer
  • Airborne Electronic Warfare system

    portion of the NGJ (NGJ-MB), designated AN/ALQ-249, reached Initial Operating Capability (IOC) in 2021. In accordance with the Joint Electronics Type

    Next Generation Jammer

    Next Generation Jammer

    Next_Generation_Jammer

  • Lockheed F-117 Nighthawk
  • American stealth ground-attack aircraft

    Nevada. The first production F-117 was delivered in 1982, and initial operating capability was achieved in October 1983. All aircraft were initially based

    Lockheed F-117 Nighthawk

    Lockheed F-117 Nighthawk

    Lockheed_F-117_Nighthawk

  • AgustaWestland AW159 Wildcat
  • Improved series of the Westland Super Lynx military helicopter

    operational capability expected in 2026. Martlet reached initial operating capability in 2021, while Sea Venom achieved "initial operating capability" in October

    AgustaWestland AW159 Wildcat

    AgustaWestland AW159 Wildcat

    AgustaWestland_AW159_Wildcat

  • Type 26 frigate
  • Frigate class being built for the Royal Navy

    date for the first ship of the class slipped to late 2026, with initial operating capability now anticipated from 2028. The frigates will be built at BAE

    Type 26 frigate

    Type 26 frigate

    Type_26_frigate

  • Sikorsky CH-148 Cyclone
  • Canadian multi-role naval helicopter

    initial helicopters (designated as Block 1), occurred during June 2015. Three years later, the Cyclone Block 2 achieved initial operating capability (IOC)

    Sikorsky CH-148 Cyclone

    Sikorsky CH-148 Cyclone

    Sikorsky_CH-148_Cyclone

  • HMS Glasgow (F88)
  • Type 26 frigate currently under construction for the Royal Navy

    reaching initial operating capability. In October 2022, the Secretary of State for Defence, Ben Wallace, stated that the initial operating capability (IOC)

    HMS Glasgow (F88)

    HMS Glasgow (F88)

    HMS_Glasgow_(F88)

  • HMS Queen Elizabeth (R08)
  • 2017 Queen Elizabeth-class aircraft carrier of the Royal Navy

    Queen Elizabeth for Operational Sea Training to prepare for Initial Operating Capability (Maritime) by the end of 2020. The summer 2020 period was spent

    HMS Queen Elizabeth (R08)

    HMS Queen Elizabeth (R08)

    HMS_Queen_Elizabeth_(R08)

  • HAL Prachand
  • Indian Light Combat Helicopter

    Combat Helicopter. Originally, the LCH was anticipated to attain initial operating capability (IOC) by December 2010. However, development of the type was

    HAL Prachand

    HAL Prachand

    HAL_Prachand

  • Queen Elizabeth-class aircraft carrier
  • Royal Navy aircraft carrier class

    experienced operating challenges. Initial operating capability of the system was achieved in July 2023 and full operating capability in April 2025. It has been

    Queen Elizabeth-class aircraft carrier

    Queen Elizabeth-class aircraft carrier

    Queen_Elizabeth-class_aircraft_carrier

  • Type 23 frigate
  • Class of frigates built for the Royal Navy

    2021) or Sea Venom anti-ship missiles (initial operating capability from October 2025 and full operating capability projected from 2026). A Thales Underwater

    Type 23 frigate

    Type 23 frigate

    Type_23_frigate

  • Assault Amphibious Vehicle
  • American tracked amphibious landing vehicle

    entered Full Scale Engineering Development on 30 March 1989, with Initial Operating Capability scheduled for Q4 FY1995. The project was ultimately terminated

    Assault Amphibious Vehicle

    Assault Amphibious Vehicle

    Assault_Amphibious_Vehicle

  • Sikorsky CH-53K King Stallion
  • Heavy transport helicopter

    that time, the first flight was planned for November 2011 with initial operating capability by 2015. The CH-53K will be the USMC's heavy lift helicopter

    Sikorsky CH-53K King Stallion

    Sikorsky CH-53K King Stallion

    Sikorsky_CH-53K_King_Stallion

  • UGM-133 Trident II
  • US/UK SLBM

    predecessor (Trident C-4). In 1972, the US Navy projected an initial operating capability (IOC) date of 1984. The US Navy shifted the IOC date to 1982

    UGM-133 Trident II

    UGM-133 Trident II

    UGM-133_Trident_II

  • Type 45 destroyer
  • 2009 Royal Navy destroyer class

    Naval Laser Capability to Help Build Cost-effective Ship-based Defence". Naval News. Retrieved 21 November 2025. "Initial Operating Capability declared for

    Type 45 destroyer

    Type 45 destroyer

    Type_45_destroyer

  • Northrop T-38 Talon
  • Military advanced trainer aircraft by Northrop

    approval and aircraft being delivered, evaluated, and receiving Initial Operating Capability by the USAF in 2027. In 1952, Northrop began work on a fighter

    Northrop T-38 Talon

    Northrop T-38 Talon

    Northrop_T-38_Talon

  • Future of the Royal Navy
  • However, operating challenges were reported in 2023 as "ongoing" and full operating capability for Sea Venom was delayed until 2026. Initial operating capability

    Future of the Royal Navy

    Future of the Royal Navy

    Future_of_the_Royal_Navy

  • General Atomics MQ-9 Reaper
  • American unmanned aerial vehicle

    delivered on 30 September 2023 with initial operating capability expected in 2025 and full operating capability expected from 2026. The 2025 UK defence

    General Atomics MQ-9 Reaper

    General Atomics MQ-9 Reaper

    General_Atomics_MQ-9_Reaper

  • Boeing–Saab T-7 Red Hawk
  • US-Swedish advanced pilot training aircraft

    of initial operational capability (IOC) to 2017. In the fiscal 2013 budget proposal, the USAF suggested delaying the initial operating capability to FY2020

    Boeing–Saab T-7 Red Hawk

    Boeing–Saab T-7 Red Hawk

    Boeing–Saab_T-7_Red_Hawk

  • Meteor (missile)
  • European beyond visual range air-to-air missile

    Force's JAS 39 Gripens in April 2016 and officially achieved initial operating capability (IOC) in July 2016. They also equip the French Air and Space

    Meteor (missile)

    Meteor (missile)

    Meteor_(missile)

  • HMS Iron Duke (F234)
  • 1993 Type 23 or Duke-class frigate of the Royal Navy

    (Tweet). Retrieved 17 September 2023 – via X (formerly Twitter). "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Iron Duke (F234)

    HMS Iron Duke (F234)

    HMS_Iron_Duke_(F234)

  • HMS Dragon (D35)
  • Destroyer of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Dragon (D35)

    HMS Dragon (D35)

    HMS_Dragon_(D35)

  • Stanley R. Mickelsen Safeguard Complex
  • Former military facilities in North Dakota, U.S.

    under the treaty. The site achieved initial operating capability on 1 April 1975, and full operational capability on 1 October 1975 costing $6 billion

    Stanley R. Mickelsen Safeguard Complex

    Stanley R. Mickelsen Safeguard Complex

    Stanley_R._Mickelsen_Safeguard_Complex

  • HMS Dauntless (D33)
  • 2010 Type 45 or Daring-class air-defence destroyer of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Dauntless (D33)

    HMS Dauntless (D33)

    HMS_Dauntless_(D33)

  • Zumwalt-class destroyer
  • Stealth missile destroyer class of the US Navy

    DDG-1000 initial delivery May 2014: DDG-1001 initial delivery March 2015: DDG-1001 Initial operating capability December 2018: DDG-1002 initial delivery

    Zumwalt-class destroyer

    Zumwalt-class destroyer

    Zumwalt-class_destroyer

  • HMS Sutherland (F81)
  • 1997 Type 23 or Duke-class frigate of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Sutherland (F81)

    HMS Sutherland (F81)

    HMS_Sutherland_(F81)

  • AgustaWestland AW101
  • Multi-role helicopter family by AgustaWestland

    experienced operating challenges and revised plans meant that Crowsnest achieved initial operating capability in July 2023. Full operating capability had been

    AgustaWestland AW101

    AgustaWestland AW101

    AgustaWestland_AW101

  • AN/PAS-13
  • Infrared sight used on small arms

    normally obscure other night vision devices. The PAS-13 reached initial operating capability (IOC) with the U.S. Army in 1998 reaching total production of

    AN/PAS-13

    AN/PAS-13

    AN/PAS-13

  • Deployable Specialized Forces
  • Military unit

    Missions Command (SMC). By October 2026, the new command will have an initial operating capability. The Deployable Specialized Forces purpose is to develop systems

    Deployable Specialized Forces

    Deployable_Specialized_Forces

  • AN/TPS-80 Ground/Air Task Oriented Radar
  • US Marine Corps transportable air defense and control AESA radar

    produced by Northrop Grumman and was expected to reach initial operating capability in August 2016. Initial production began in June of 2019. In October of 2025

    AN/TPS-80 Ground/Air Task Oriented Radar

    AN/TPS-80 Ground/Air Task Oriented Radar

    AN/TPS-80_Ground/Air_Task_Oriented_Radar

  • 1st Aviation Brigade (United Kingdom)
  • Military unit

    Naval Air Station Yeovilton. It reached initial operating capability on 1 April 2021 and full operating capability on 1 January 2023. For a period it was

    1st Aviation Brigade (United Kingdom)

    1st_Aviation_Brigade_(United_Kingdom)

  • HMS Somerset (F82)
  • 1996 Type 23 or Duke-class frigate of the Royal Navy

    design". Navy Lookout. 28 February 2023. Retrieved 14 April 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Somerset (F82)

    HMS Somerset (F82)

    HMS_Somerset_(F82)

  • USS Zumwalt
  • Guided missile destroyer of the United States Navy

    2013, with a March 2015 target date for Zumwalt to meet her initial operating capability but, by 2012 the planned completion and delivery of the vessel

    USS Zumwalt

    USS Zumwalt

    USS_Zumwalt

  • Air Force Installation and Mission Support Center
  • Military unit

    reached initial operating capability on 1 Oct. 2015 and full operational capability in October 2016. The Air Force moved several field operating agencies

    Air Force Installation and Mission Support Center

    Air Force Installation and Mission Support Center

    Air_Force_Installation_and_Mission_Support_Center

  • Boeing P-8 Poseidon
  • American maritime patrol aircraft

    delivered on 13 March 2020. The RAF declared the P-8 had reached initial operating capability (IOC) on 1 April 2020. The final ordered aircraft arrived at

    Boeing P-8 Poseidon

    Boeing P-8 Poseidon

    Boeing_P-8_Poseidon

  • HMS Portland (F79)
  • 2001 Type 23 or Duke-class frigate of the Royal Navy

    design". Navy Lookout. 28 February 2023. Retrieved 14 April 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Portland (F79)

    HMS Portland (F79)

    HMS_Portland_(F79)

  • Challenger 2
  • British main battle tank

    had been accepted. The initial operating capability for the upgraded tanks is expected by 2027, with full operation capability expected to be declared

    Challenger 2

    Challenger 2

    Challenger_2

  • Borisoglebsk-2
  • Russian electronic warfare system

    disrupt communications and GPS systems. Borisoglebsk 2 achieved initial operating capability in 2010, but was not ordered and delivered to Russian military

    Borisoglebsk-2

    Borisoglebsk-2

    Borisoglebsk-2

  • Northrop Grumman MQ-4C Triton
  • Maritime version of RQ-4 Global Hawk

    are scheduled to fly a total of 2,000 hours before reaching initial operating capability. The second MQ-4C Triton model flew on 16 October 2014, 17 months

    Northrop Grumman MQ-4C Triton

    Northrop Grumman MQ-4C Triton

    Northrop_Grumman_MQ-4C_Triton

  • HMS Duncan (D37)
  • 2013 Type 45 or Daring-class air-defence destroyer of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Duncan (D37)

    HMS Duncan (D37)

    HMS_Duncan_(D37)

  • Lightning Force HQ
  • Military unit

    deployment to the United States. 617 Squadron is planned to declare initial operating capability for land based operations by the end of 2018, before beginning

    Lightning Force HQ

    Lightning Force HQ

    Lightning_Force_HQ

  • Boxer (armoured fighting vehicle)
  • Multinational wheeled armoured fighting vehicle

    vehicles were in use for training purposes by October 2020, with an Initial Operating Capability (IOC) declared in October 2022. Rheinmetall's contract calls

    Boxer (armoured fighting vehicle)

    Boxer (armoured fighting vehicle)

    Boxer_(armoured_fighting_vehicle)

  • Object-capability model
  • Computer security model

    (operating system),[dubious – discuss] CapROS, Coyotos, seL4, OKL4 and Fiasco.OC are secure operating systems that implement the object-capability model

    Object-capability model

    Object-capability_model

  • W76
  • US - UK thermonuclear warhead of the 1970s

    Administration announced that it had started to manufacture the W76-2. Initial operating capability was expected in the final quarter of 2019, and manufacturing

    W76

    W76

    W76

  • IOC (disambiguation)
  • Topics referred to by the same term

    of counting the number of times that identical letters appear Initial operating capability, minimum level of deployment, especially in the US military Intraoral

    IOC (disambiguation)

    IOC_(disambiguation)

  • HMS St Albans (F83)
  • 2002 Type 23 or Duke-class frigate of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS St Albans (F83)

    HMS St Albans (F83)

    HMS_St_Albans_(F83)

  • Boeing AH-64 Apache
  • U.S. attack helicopter

    received by mid-2013. On 27 November 2013, the AH-64E achieved initial operating capability (IOC). In March 2014, the 1st–229th Attack Reconnaissance Battalion

    Boeing AH-64 Apache

    Boeing AH-64 Apache

    Boeing_AH-64_Apache

  • HMS Daring (D32)
  • 2009 Type 45 or Daring-class air-defence destroyer of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Daring (D32)

    HMS Daring (D32)

    HMS_Daring_(D32)

  • Fairchild Republic A-10 Thunderbolt II
  • American close air support attack aircraft

    Force Base, Arizona, in March 1976. The first unit to achieve initial operating capability was the 354th Tactical Fighter Wing at Myrtle Beach Air Force

    Fairchild Republic A-10 Thunderbolt II

    Fairchild Republic A-10 Thunderbolt II

    Fairchild_Republic_A-10_Thunderbolt_II

  • List of equipment of the British Army
  • Equipment of the British Army

    magnification day scope for the L115A3 Sniper Rifle. Sniper Thermal Imaging Capability (STIC) - thermal imagining sight that is mounted on the L115A3 and AX50

    List of equipment of the British Army

    List of equipment of the British Army

    List_of_equipment_of_the_British_Army

  • 34th Fighter Squadron
  • Military unit

    announced that the 34th had become the first squadron to achieve initial operating capability with the F-35A, the Air Force′s variant of the F-35 Lightning

    34th Fighter Squadron

    34th Fighter Squadron

    34th_Fighter_Squadron

  • Boeing MH-139 Grey Wolf
  • Military utility helicopter model by Boeing

    Force Global Strike Command announced the MH-139 reached its initial operating capability the day before. On 1 October 2026, Boeing announced it had received

    Boeing MH-139 Grey Wolf

    Boeing MH-139 Grey Wolf

    Boeing_MH-139_Grey_Wolf

  • HMS Defender (D36)
  • 2013 Type 45 or Daring-class air-defence destroyer of the Royal Navy

    Navy service". Navy Lookout. 5 May 2023. Retrieved 5 May 2023. "Initial Operating Capability declared for Royal Navy Sea Venom anti-ship missile". Navy Lookout

    HMS Defender (D36)

    HMS Defender (D36)

    HMS_Defender_(D36)

  • RUM-139 VL-ASROC
  • Anti-submarine missile

    production with the Mark 54 torpedo. The Mk 54 Mod 0 torpedo achieved Initial Operating Capability in 2010, and the U.S. Navy is transitioning its VL-ASROCs to

    RUM-139 VL-ASROC

    RUM-139 VL-ASROC

    RUM-139_VL-ASROC

  • Area 51
  • U.S. Air Force facility in Nevada, U.S.

    set up a group-level organization to guide the F-117A to an initial operating capability. That organization became the 4450th Tactical Group (Initially

    Area 51

    Area 51

    Area_51

  • Challenger 3
  • Main battle tank

    accepted. The initial operating capability for the upgraded tanks is expected by 2027, with trials commencing Q2 2025, with full operation capability expected

    Challenger 3

    Challenger 3

    Challenger_3

  • Ship-to-Shore Connector
  • Air-cushioned landing craft

    mid-November 2014. These were to be delivered in 2017 and achieve initial operating capability (IOC) in 2020. Textron can produce as many as 12 SSCs per year

    Ship-to-Shore Connector

    Ship-to-Shore Connector

    Ship-to-Shore_Connector

  • AGM-65 Maverick
  • American air-to-surface missile

    first delivery to the USAF in October 1983. The version received initial operating capability in February 1986. The AGM-65F is a hybrid Maverick combining

    AGM-65 Maverick

    AGM-65 Maverick

    AGM-65_Maverick

  • No. 35 Squadron RAAF
  • Royal Australian Air Force squadron

    was nearing Initial Operating Capability. The RAAF's first C-27J arrived in Australia on 25 June 2015, and No. 35 Squadron began operating the aircraft

    No. 35 Squadron RAAF

    No._35_Squadron_RAAF

  • Boeing F/A-18E/F Super Hornet
  • Series of carrier-based multirole combat aircraft

    Hornet entered fleet service with the U.S. Navy. It achieved initial operating capability (IOC) in September 2001 with the U.S. Navy's Strike Fighter Squadron

    Boeing F/A-18E/F Super Hornet

    Boeing F/A-18E/F Super Hornet

    Boeing_F/A-18E/F_Super_Hornet

  • Boeing E-7 Wedgetail
  • Airborne early warning and control aircraft

    order of three aircraft. In late 2022, it was reported that initial operating capability for the aircraft had slipped to 2024. Then in 2024 it was indicated

    Boeing E-7 Wedgetail

    Boeing E-7 Wedgetail

    Boeing_E-7_Wedgetail

  • Cheyenne Mountain Complex
  • Training complex located in El Paso County, Colorado

    backup 3090-200J mainframes), and SPADOC 4 block A achieved initial operating capability (IOC) in April 1989. The CSS-R "first element" achieved IOC on

    Cheyenne Mountain Complex

    Cheyenne Mountain Complex

    Cheyenne_Mountain_Complex

  • Cyber & Specialist Operations Command
  • Military unit

    up the post on 1 December 2011. Initial Operating Capability was achieved in April 2012 and Full Operating Capability was reached in April 2013, giving

    Cyber & Specialist Operations Command

    Cyber & Specialist Operations Command

    Cyber_&_Specialist_Operations_Command

  • Arleigh Burke-class destroyer
  • US Navy guided-missile destroyer class

    ESSM Block 2, which achieved initial operating capability (IOC) in 2021, features a dual-mode seeker with ARH capability. The SM-3, SM-6, and SM-2ER Block

    Arleigh Burke-class destroyer

    Arleigh Burke-class destroyer

    Arleigh_Burke-class_destroyer

  • Stryker
  • Canadian/American family of wheeled armored fighting vehicles

    additional until July 2003. In May, the Army readied the Stryker for initial operating capability at Fort Polk. The New York Times noted the swiftness with which

    Stryker

    Stryker

    Stryker

  • Italian aircraft carrier Cavour
  • Italian aircraft carrier

    Norfolk on 16 April and returned to homeport Taranto on 30 April. Initial operating capability for the F-35s is expected for 2024. In February 2022, she was

    Italian aircraft carrier Cavour

    Italian aircraft carrier Cavour

    Italian_aircraft_carrier_Cavour

  • Mil Mi-24
  • Family of assault and attack helicopters

    Mi-24A (izdeliye 245) entered production in 1970, obtaining its initial operating capability in 1971 and was officially accepted into the state arsenal in

    Mil Mi-24

    Mil Mi-24

    Mil_Mi-24

  • United States Army Western Hemisphere Command
  • Command of the United States Army

    threatening capabilities in our hemisphere." USAWHC will reach its initial operating capability in February 2026, and the command is expected to be fully operational

    United States Army Western Hemisphere Command

    United States Army Western Hemisphere Command

    United_States_Army_Western_Hemisphere_Command

  • AN/SPY-6
  • US Navy 3D AESA air and missile defense radar

    $300m/unit in serial production. Testing is planned for 2021 and Initial operating capability is planned for March 2023. The Navy was forced to halt the contract

    AN/SPY-6

    AN/SPY-6

    AN/SPY-6

  • Lockheed Martin F-35 Lightning II
  • American stealth multirole fighter aircraft

    2B was the first combat-ready release planned for the USMC's Initial Operating Capability (IOC). Block 3i retains the capabilities of 2B while having new

    Lockheed Martin F-35 Lightning II

    Lockheed Martin F-35 Lightning II

    Lockheed_Martin_F-35_Lightning_II

  • Iron Beam
  • Directed-energy weapon, Laser weapon

    laser technologies. THEL conducted test firing in FY1998, and Initial Operating Capability (IOC) was planned in FY1999. However, this was significantly

    Iron Beam

    Iron Beam

    Iron_Beam

  • No. 33 Squadron RAAF
  • Royal Australian Air Force tanker/transport squadron

    It began re-equipping with KC-30s in June 2011, and achieved initial operating capability with the type in February 2013. One of its aircraft was deployed

    No. 33 Squadron RAAF

    No._33_Squadron_RAAF

  • Iveco SuperAV
  • Armored personnel carrier

    phase of the effort with initial operating capability planned for early 2020, fielding in late 2020, and full operational capability scheduled for 2023. The

    Iveco SuperAV

    Iveco SuperAV

    Iveco_SuperAV

  • Fuchsia (operating system)
  • Operating system by Google

    Fuchsia is an open-source capability-based operating system developed by Google. In contrast to Google's Linux-based operating systems such as ChromeOS

    Fuchsia (operating system)

    Fuchsia (operating system)

    Fuchsia_(operating_system)

  • AGM-84H/K SLAM-ER
  • Long-range, precise air-launched air-to-ground standoff cruise missile

    Dale (CG-19) off the coast of Puerto Rico. The SLAM-ER obtained initial operating capability in June 2000. A total of three SLAM-ER missiles were fired by

    AGM-84H/K SLAM-ER

    AGM-84H/K SLAM-ER

    AGM-84H/K_SLAM-ER

  • Gorgon Stare
  • US drone reconnaissance sensor

    revealed that the Gorgon Stare Increment 2 pod had achieved initial operating capability (IOC) earlier in the year. While the Increment 1 system, first

    Gorgon Stare

    Gorgon_Stare

  • USS Gerald R. Ford
  • Gerald R. Ford–class aircraft carrier

    Downey described the ship as "fully delivered" and has "met her initial operating capability". When she was commissioned, Gerald R. Ford was the world's largest

    USS Gerald R. Ford

    USS Gerald R. Ford

    USS_Gerald_R._Ford

  • PAVE PAWS
  • Early warning radar

    Cod system reached Initial operating capability (IOC) as the Cape Cod Missile Early Warning Station on 4 April 1981 with initial operational test and

    PAVE PAWS

    PAVE PAWS

    PAVE_PAWS

  • AGM-179 JAGM
  • American air-to-surface missile

    AGM-114 Hellfire missiles, with at least one ship having reached initial operating capability. Lockheed Martin's self-funded upgrade to the JAGM, the JAGM-Medium

    AGM-179 JAGM

    AGM-179 JAGM

    AGM-179_JAGM

  • Schiebel Camcopter S-100
  • Austrian UAV rotorcraft

    two systems with options for the purchase of a further four. Initial operating capability was expected in 2027/8, with FOC in 2032. The Hellenic Navy acquired

    Schiebel Camcopter S-100

    Schiebel Camcopter S-100

    Schiebel_Camcopter_S-100

  • AGM-88 HARM
  • U.S. high-speed air-to-surface anti-radiation missile

    missile was approved for full production in March 1983, obtained initial operating capability (IOC) on the A-7E Corsair II in late 1983 and then deployed in

    AGM-88 HARM

    AGM-88 HARM

    AGM-88_HARM

  • Lockheed C-5 Galaxy
  • American heavy military transport aircraft

    Base replaced all remaining C-5s with C-17s. The C-5M reached initial operating capability (IOC) on 24 February 2014 with 16 aircraft delivered. On 13 September

    Lockheed C-5 Galaxy

    Lockheed C-5 Galaxy

    Lockheed_C-5_Galaxy

  • Lynx (Rheinmetall armoured fighting vehicle)
  • German armored fighting vehicle

    following that an initial operating capability of the selected platform is expected to be reached in 2024–2025, while final operating capability is expected

    Lynx (Rheinmetall armoured fighting vehicle)

    Lynx (Rheinmetall armoured fighting vehicle)

    Lynx_(Rheinmetall_armoured_fighting_vehicle)

  • Bell–Boeing V-22 Osprey
  • Military transport tiltrotor

    June 2018; initial operating capability was achieved in 2021, with fielding to the fleet by the mid-2020s. The first CMV-22B made its initial flight in

    Bell–Boeing V-22 Osprey

    Bell–Boeing V-22 Osprey

    Bell–Boeing_V-22_Osprey

  • Mark 38 25 mm machine gun system
  • Short-range shipboard weapon system

    and qualification for the Mod 4. The Mk 38 Mod 4 will achieve initial operating capability on Arleigh Burke-class destroyers with Aegis Baseline 9 in FY2022

    Mark 38 25 mm machine gun system

    Mark 38 25 mm machine gun system

    Mark_38_25_mm_machine_gun_system

  • Advanced Precision Kill Weapon System
  • American 2.75-inch precision guided rocket

    contract from US Army to US Navy. March 2012: APKWS II achieves initial operating capability (IOC) and is sent to Afghanistan with the United States Marine

    Advanced Precision Kill Weapon System

    Advanced Precision Kill Weapon System

    Advanced_Precision_Kill_Weapon_System

  • CAMM (missile family)
  • Family of surface-to-air missiles developed by MBDA UK

    would occur "late summer/early autumn [2021]". Sky Sabre had its initial operating capability declared on 8 October 2021 with the first systems delivered by

    CAMM (missile family)

    CAMM_(missile_family)

  • Standing Joint Force Headquarters
  • Military unit

    Ministry of Defence. p. 2. "Joint Forces Command - Overview for Initial Operating Capability" (PDF). GOV.UK. Ministry of Defence. p. 1. Retrieved 2 November

    Standing Joint Force Headquarters

    Standing_Joint_Force_Headquarters

  • AN/AAQ-28 Litening
  • Military aircraft targeting sensor pod

    further development and sales of the Litening pod, reaching Initial Operating Capability (IOC) the same year. Northrop Grumman and Rafael completed product

    AN/AAQ-28 Litening

    AN/AAQ-28 Litening

    AN/AAQ-28_Litening

  • Hawker Siddeley Nimrod
  • Maritime patrol aircraft family

    Poseidon aircraft for the RAF. The RAF declared the P-8 had reached initial operating capability (IOC) on 1 April 2020, by which time two of the planes had been

    Hawker Siddeley Nimrod

    Hawker Siddeley Nimrod

    Hawker_Siddeley_Nimrod

  • Tomahawk missile
  • American long-range, subsonic cruise missile

    responsiveness. A Low Rate Initial Production contract was awarded to Raytheon (RTX) in October 2002. TACTOM reached Initial Operating Capability (IOC) in 2004. Tactical

    Tomahawk missile

    Tomahawk missile

    Tomahawk_missile

  • Stratus (missile family)
  • Anglo-French missile programme

    Maritime Offensive Surface Strike programme (MOSS), NSM had its initial operating capability declared on 19 December 2023 a week after the first set was successfully

    Stratus (missile family)

    Stratus (missile family)

    Stratus_(missile_family)

  • Lockheed MC-130
  • Special mission military aircraft

    variously as "MC-X" or "M-X"), with USAF at that time hoping for an Initial Operating Capability date of 2018. One analyst questioned the survivability of slow

    Lockheed MC-130

    Lockheed MC-130

    Lockheed_MC-130

Searches for online references containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Search references containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Search queries for Facebook and twitter posts, hashtags with INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Follow users with usernames @INITIAL OPERATING-CAPABILITY or posting hashtags containing #INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Online names & meanings

Search queries for Facebook and twitter users, user names, hashtags with INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Top search, Social media, medium, facebook & news articles containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Searches for Acronyms & meanings containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY

Searches, Indeed job searches and job offers containing INITIAL OPERATING-CAPABILITY

Other words and meanings similar to

INITIAL OPERATING-CAPABILITY

Search in online dictionary sources & meanings containing INITIAL OPERATING-CAPABILITY

INITIAL OPERATING-CAPABILITY