Search references for GROUND DELAY-PROGRAM. Phrases containing GROUND DELAY-PROGRAM
See searches and references containing GROUND DELAY-PROGRAM!GROUND DELAY-PROGRAM
Traffic flow initiative for aviation in the United States
An air traffic control ground delay program or FAA Flow Control is a traffic flow initiative that is instituted by the United States Federal Aviation Administration
Ground_delay_program
Topics referred to by the same term
description of standards by which documents are created and maintained Ground delay program, a traffic flow initiative for aviation in the United States Guanosine
GDP_(disambiguation)
The system is capable of issuing ground delay programs (GDPs) and ground stop programs (GSs). Ground delay programs are instituted on a particular airport
Enhanced Traffic Management System
Enhanced_Traffic_Management_System
Air traffic regulation technique
of delaying aircraft, so it is preferable to keep them on the ground at their place of departure, called a ground delay program. This way, the delay can
Air_traffic_flow_management
Infantry fighting vehicle
The Ground Combat Vehicle (GCV) was a program initiated by the United States Army in 2009, with the goal of developing a next-generation armored fighting
Ground_Combat_Vehicle
2017 wildfires in Northern California
issues spurred the Federal Aviation Administration to implement a ground delay program at San Francisco International Airport, and nearly 280 flights were
October 2017 Northern California wildfires
October_2017_Northern_California_wildfires
Space flight simulator video game
game, would also be involved in Kerbal Space Program 2's development. Repeated delays to Kerbal Space Program 2's release date from 2020 onwards resulted
Kerbal_Space_Program_2
NASA-led lunar exploration program
SLS, Orion, and the HLS. Additional program elements include the Commercial Lunar Payload Services, Exploration Ground Systems, Artemis Base Camp, the Lunar
Artemis_program
Special Operations Light utility vehicle
The Ground Mobility Vehicle (GMV) is a U.S. Special Operations Command, (US)SOCOM program, initially modifying Humvees into several variants for use by
Ground Mobility Vehicle (USSOCOM)
Ground_Mobility_Vehicle_(USSOCOM)
Weather event in the United States
northern half of the state. Near New York City, New York, a full ground delay program was enacted at the John F. Kennedy International Airport. Snowfall
January 19–20, 2025 nor'easter
January_19–20,_2025_nor'easter
1961–1972 American crewed lunar exploration program
1979 after development of the Space Shuttle was delayed too long to save it. The Apollo–Soyuz program also used Apollo hardware for the first joint nation
Apollo_program
NOTAM system outage
On January 11, 2023, U.S. flights were grounded or delayed as the Federal Aviation Administration (FAA) attempted to fix a system outage. FAA paused all
2023_FAA_system_outage
Person directing aircraft in airspace
the aftermath of the 1981 PATCO strike; the FAA implemented Ground Delay Programs and ground stops at Newark Liberty, New York ARTCC, and Washington TRACON
Air_traffic_controller
Early type of computer memory
concept of the delay line originated with World War II radar research, as a system to reduce clutter from reflections from the ground and other non-moving
Delay-line_memory
Air traffic control center in Nashua, New Hampshire, US
Sequencing programs which include Departure sequencing program (DSP), Arrival Sequencing Program (ASP)or En-route sequencing program (ESP). Ground Delay Programs
Boston Air Route Traffic Control Center
Boston_Air_Route_Traffic_Control_Center
Program of United States Army
the Ground Combat Vehicle in February 2014, the Army's M2 Bradley replacement effort was restarted under the Future Fighting Vehicle (FFV) program. The
XM30 Mechanized Infantry Combat Vehicle
XM30_Mechanized_Infantry_Combat_Vehicle
United States anti-ballistic missile system
encompasses 44 ground-based missile interceptors housed at two military bases. Boeing Defense, Space & Security is the prime contractor of the program, tasked
Ground-Based Midcourse Defense
Ground-Based_Midcourse_Defense
Twin-aisle airliner family
raises prospect of further delay". Flightglobal. November 15, 2010. Retrieved November 15, 2010. Norris, Guy. "787s Grounded After Emergency Landing".
Boeing_787_Dreamliner
Reconnaissance mission of the main belt asteroid 16 Psyche
Psyche (/ˈsaɪki/ SY-kee) is a NASA Discovery Program space mission launched on October 13, 2023, to explore the origin of planetary cores by orbiting
Psyche_(spacecraft)
2015 space flight simulation video game
content: Making History in March 2018 and Breaking Ground in May 2019. A sequel, Kerbal Space Program 2, was released in early access on 24 February 2023
Kerbal_Space_Program
Sixth-generation strike fighter program
the DoD has resulted in the program and contract award being delayed. In July 2025, it was announced that the F/A-XX program received $76 million in funding
F/A-XX_program
South Korean fighter aircraft
Indonesian government request. The Block II program, which focuses primarily on the serial integration of air-to-ground and air-to-ship armaments, will be executed
KAI_KF-21_Boramae
Next generation of the Boeing 777
Factory. The 777-9 first flew on January 25, 2020. The program has suffered from numerous delays; as of October 2025,[update] Boeing expects the first
Boeing_777X
Attack aircraft development program
due to delays and other problems with the JSF development program, he was removing Major General David R. Heinz from command of the program and would
Joint_Strike_Fighter_program
Intercontinental ballistic missile
that program costs had increased to over $125 billion, significantly exceeding the initial $78 billion estimate, and that deployment would be delayed by
LGM-35_Sentinel
Military surveillance system
aircraft's sensors on a laptop on the ground. There's little time delay and usage of ROVER greatly improves the FAC on the ground reconnaissance and target identification
ROVER
American space and aeronautics agency
maintains extensive ground and communications infrastructure, including the Deep Space Network and the Near Earth Network. Its science programs focus on Earth
NASA
Initial American crewed spaceflight program (1958–1963)
Aurora 7 250 miles (400 km) off-course, delaying recovery. Afterwards, he joined the Navy's "Man in the Sea" program and is the only American to be both an
Project_Mercury
NASA program for launch vehicle support
The Exploration Ground Systems (EGS) program was established to develop, modernize, and operate the ground infrastructure at NASA's Kennedy Space Center
Exploration_Ground_Systems
European Union regulation
pay the passenger compensation, arguing the delay was 2 hours and 58 minutes when the plane touched the ground. In September 2015, the Court of Justice of
Air Passengers Rights Regulation
Air_Passengers_Rights_Regulation
Ratings: Whiskey Cavalier Series Debut Thrives in Delayed Viewing Despite Rerun Telecast". Programming Insider. Archived from the original on March 18,
List_of_The_Rookie_episodes
American stealth bomber aircraft
the Raider to reconcile a long-range strike gap should the AUKUS program have delays. In April 2026, Senator James Paterson called for the Albanese government
Northrop_Grumman_B-21_Raider
First electronic general-purpose digital computer
his description of a memory unit (the mercury delay line) which would hold both the data and the program. John von Neumann, who was consulting for the
ENIAC
Type of digital circuit
total gate delay, reducing the frequency of oscillation. The ring oscillator is a member of the class of time-delay oscillators. A time-delay oscillator
Ring_oscillator
Computer architecture where code and data share a common bus
memory device, a mercury metal delay-line memory. This was the first time the construction of a practical stored-program machine was proposed. At that
Von_Neumann_architecture
American news and talk television show
mobile app for smartphones and tablets. The program airs live in the Eastern Time Zone and on tape delay beginning at 7:00 a.m. in each of the remaining
Today_(American_TV_program)
Truck
October 2018). "US Army triggers start of possible ground mobility vehicle competition after long delay". Air Force Times. Retrieved 27 February 2022.[dead
M1297 Army ground mobility vehicle
M1297_Army_ground_mobility_vehicle
civilian program. Analysts remain divided on the long-term impact of the conflict, debating whether the physical damage has permanently delayed the program or
Nuclear_program_of_Iran
NASA/ESA space telescope launched in 1990
the U.S. space program to a halt, grounded the Shuttle fleet, and forced the launch to be postponed for several years. During this delay the telescope
Hubble_Space_Telescope
consumed 125 kW of power. Its primary storage was serial-access mercury delay lines capable of storing 1,000 words of 11 decimal digits plus sign (72-bit
History_of_computing_hardware
First space station launched and operated by NASA (1973–1979)
Skylab 3, and Skylab 4. The manifestation of the Apollo Applications Program, Skylab was constructed from a repurposed Saturn V third stage (the S-IVB)
Skylab
NASA super heavy-lift expendable launch vehicle used in the Artemis Program
schedule delay from November 2018 to a June 2020 launch date. Since the replan, the SLS Program now projects the Artemis I launch will be delayed to at least
Space_Launch_System
U.S. Army NGSW rifle
2025. CPE Ground Army (3 April 2026). "U.S. Army Announces XM8 Carbine Delivery Order". cpeground.army.mil. Capability Program Executive - Ground. Archived
M7_rifle
High-thrust turbofan jet engine
its redesign led to a 3–month delay. SETT was followed by four more test engines by May 2018. The certification program began in May 2017. Eight additional
General_Electric_GE9X
Cancelled regional jet airliner project by Mitsubishi Aircraft Corporation
higher than its competition. The program was delayed by six months with final design frozen in mid-2010, first flight delayed to the second quarter of 2012
Mitsubishi_SpaceJet
Programs by the Soviet Union to land humans on the Moon
destruction of the rocket and the entire launch complex, which delayed the N1-L3 program for two years. In an automatic Moon flyby, these first two launches
Soviet_crewed_lunar_programs
1961–1966 US human spaceflight program
human spaceflight program to fly. It was conducted after the first American crewed space program, Project Mercury, while the Apollo program was still in early
Project_Gemini
American military aerial refueling and transport aircraft
Tanker Program Braces For Another Delay". Aviation Week. 26 May 2016. Archived from the original on 28 May 2016. "Boeing's Penalty For Latest KC-46 Delay Still
Boeing_KC-46_Pegasus
Artemis program crewed spacecraft
and launch the Orion, funded separately in the NASA Exploration Ground Systems program, running at about $600 million per year in 2021, estimated then
Orion_(spacecraft)
1930s programs of U.S. president Franklin D. Roosevelt
fallen 20% and more, "deflation" exacerbated the burden of debt and would delay recovery. They rejected a strong move in Congress to limit the workweek
New_Deal
Italy/Japan/UK aircraft development and acquisition programme
providing reasons. While future participation in GCAP was not ruled out, delaying a decision risked reducing Sweden's influence over the programme's development
Global_Combat_Air_Programme
United States government food assistance program
Program (SNAP), formerly and colloquially still known as the Food Stamp Program, or simply food stamps, is a United States federal government program
Supplemental Nutrition Assistance Program
Supplemental_Nutrition_Assistance_Program
Stadium in London, England
previous ground, White Hart Lane. With a seating capacity of 62,850, it is the third largest football stadium in England and the largest club ground in London
Tottenham_Hotspur_Stadium
1972–2011 United States human spaceflight program
span with a 'launch per month' expected at the peak of the program, but extensive delays in the development of the International Space Station never
Space_Shuttle_program
American close air support attack aircraft
required, thus the program was canceled. YA-10A Pre-production variant. 12 were built. A-10A Single-seat close air support, ground-attack production version
Fairchild Republic A-10 Thunderbolt II
Fairchild_Republic_A-10_Thunderbolt_II
Calculation of signal delay times in integrated circuits
delay as a constant plus k times the load capacitance. A more complex model called Delay Calculation Language, or DCL, calls a user-defined program whenever
Delay_calculation
Electrical safety device used in household wiring
when a ground fault occurs on a circuit protected by a 30 mA IΔn RCD in series with a 300 mA IΔn RCD either or both may trip. Special time-delayed types
Residual-current_device
2019 American science fiction drama
the Soviet space program; in our reality, he died during an operation in Moscow (in 1966) ... And after that point, their Moon program really never pulled
For_All_Mankind_(TV_series)
French business jet
near three-year delay to 2020 with 12 cancellations in 2016, it demanded compensation from Safran for the engine delays. After ground tests in spring
Dassault_Falcon_6X
However, when the invasion of Czechoslovakia in August by the Soviet Union delayed ratification around the world, Israel's internal division and hesitation
Israel_and_nuclear_weapons
commit a surgical strike on its nuclear program. These concerns prompted consideration of whether China should delay its first test, on the theory that a
Nuclear_weapons_of_China
Russian stealth multirole fighter aircraft
combat aircraft. A multirole fighter capable of aerial combat as well as ground and maritime strike, the Su-57 incorporates stealth, supermaneuverability
Sukhoi_Su-57
Bilateral cooperation agreement signed in 2021
The Iran–China 25-year Cooperation Program or Comprehensive Strategic Partnership between I.R. Iran, P.R. China is a 25-year cooperation agreement on
Iran–China 25-year Cooperation Program
Iran–China_25-year_Cooperation_Program
American air-to-surface missile
Range: 12,000 yd (11,000 m) Guidance: Semi-active laser homing Delayed and programmable fuzing in for hardened targets Warhead: Blast fragmentation/incendiary
AGM-114_Hellfire
Games from the 1940s to the 1970s
Bertie the Brain and Nimrod computers in 1950 and 1951 and a bouncing ball program in 1951, video games also became the purview of academic research. A series
Early_history_of_video_games
Program of United States Army
fleet. In October 2013, the Army released a new draft RFP, delaying the start of the program by one year and raising the development costs by several hundred
Armored_Multi-Purpose_Vehicle
Italian open-source hardware and software company
LED integrated into the Arduino board. This program uses the functions pinMode(), digitalWrite(), and delay(), which are provided by the internal libraries
Arduino
Canceled space missions
ready until at least February 1969, delaying the entire sequence. George Low, the manager of the Apollo Spacecraft Program Office, proposed a solution in August
Canceled_Apollo_missions
American strategic bomber
stealth bomber. The program was restarted in 1981, largely as an interim measure due to delays in the B-2 stealth bomber program. The B-1A design was
Rockwell_B-1_Lancer
First Gemini program spacelaunch
new tracking and communication systems for the Gemini program and provided training for the ground support crews for the first crewed missions. Originally
Gemini_1
Sixth and most recent crewed Moon landing
Time (EST) on December 7, 1972, following the only launchpad delay in the Apollo program, which was caused by a hardware problem, Apollo 17 was a "J-type"
Apollo_17
2024 action role-playing video game
Franklin Bellone (May 29, 2024). "How to fix delayed audio in Wuthering Waves cutscenes: Audio delay solution". Destructoid. Archived from the original
Wuthering_Waves
US Air Force advanced trainer acquisition program
The T-X program is a United States Air Force development and acquisition program for a new two-seat jet trainer to replace the Northrop T-38 Talon. On
T-X_program
Proposed carrier-based strike aircraft
and several delays, causing questions of the program's ability to deliver upon its objectives; these doubts led to the development program's cancellation
McDonnell Douglas A-12 Avenger II
McDonnell_Douglas_A-12_Avenger_II
American satellite-based radio navigation service
independent of the satellite speed, the time delay between when the satellite transmits a signal and the ground station receives it is proportional to the
Global_Positioning_System
Cancellation or delay of a sports event due to rain
Delays due to other forms of weather are named "snow delay", "lightning delay", "thunderstorm delay", or "fog delay" (or generically "weather delay")
Rainout_(sports)
Future system serving Los Angeles International Airport
delayed, and as of March 2026 there is no announced planned opening date. A contract arbitrator found LAWA responsible for nearly two years of delay,
SkyLink (Los Angeles International Airport)
SkyLink_(Los_Angeles_International_Airport)
European main battle tank project
The Main Ground Combat System (MGCS) is a project launched in 2017 by Germany and France, aiming to replace their current Leopard 2 and Leclerc main battle
Main_Ground_Combat_System
American stealth multirole fighter aircraft
considering purchases. The program has drawn criticism for its unprecedented size, complexity, ballooning costs, and delayed deliveries, partially caused
Lockheed Martin F-35 Lightning II
Lockheed_Martin_F-35_Lightning_II
U.S. airdropped kinetic weapon
with bins built in to hold the projectiles, opened by a mechanical time delay fuze. The adaptors themselves were 69.9 inches (1.78 m) long and 14.18 inches
Lazy_Dog_(bomb)
rockets, including designing several variations for ground-to-air, ground-to-ground, air-to-ground and air-to-air combat. The earliest known use by the
Soviet_rocketry
French drama web television series
Television. It was released globally by Apple TV on 4 March 2026, after a delay caused by a plagiarism investigation. The series was scheduled to premiere
The_Hunt_(2026_TV_series)
viewed with skepticism due to bugs, delays in development, and the comparative efficiency of "hand-coded" programs written in assembly. However, in a hardware
History of programming languages
History_of_programming_languages
and launch delay. Just been apprised there has been a technical resolution; satellites and F9 are in great shape and ready to go! Was ground harness test
List of Falcon 9 and Falcon Heavy launches (2010–2019)
List_of_Falcon_9_and_Falcon_Heavy_launches_(2010–2019)
research would not imply any real delay as the civil nuclear program had been pursued in parallel to the military program for several years. The research
Swedish nuclear weapons program
Swedish_nuclear_weapons_program
NASA/ESA/CSA space telescope launched in 2021
potential launch in 2007 and a US$1 billion budget. The program saw enormous cost overruns and delays. A significant redesign was carried out in 2005, with
James_Webb_Space_Telescope
Providing residence or citizenship in exchange for investment
the program will help raise funds for climate action, needed for a plan to move 90% of the island's around 12,500-strong population onto higher ground and
Immigrant_investor_programs
U.S. Special Operations Command light utility vehicle
October 2018). "US Army triggers start of possible ground mobility vehicle competition after long delay". Air Force Times. Retrieved 27 February 2022.[permanent
M1288_GMV_1.1
months. The delay in restarting the program was to allow the IAEA to re-install monitoring equipment. The actual resumption of the program coincided with
History of the nuclear program of Iran
History_of_the_nuclear_program_of_Iran
Classification of post-2020s jet fighters
the previous F-22 and F-35 development programs that depended on new technologies that drove up cost and delayed introduction, the Air Force is intending
Sixth-generation_fighter
Pseudoscientific approach to psychotherapy
Neuro-linguistic programming (NLP) is a pseudoscientific approach to communication, personal development, and psychotherapy that first appeared in Richard
Neuro-linguistic_programming
American stealth air superiority fighter
Advanced Tactical Fighter (ATF) program, the aircraft was designed as an air superiority fighter, but also incorporates ground attack, electronic warfare,
Lockheed_Martin_F-22_Raptor
First crewed flight of the Soyuz programme
Soyuz programme emerged from this eighteen-month delay, mirroring the improvements made in the Apollo program after the Apollo 1 tragedy. Although it failed
Soyuz_1
National Space Agency of Pakistan
launched in 1984. Pakistan's communication satellite program also led to the expansion of a ground station in Lahore in 1983. SUPARCO began constructing
SUPARCO
American attack helicopter
helicopter acquisition program, part of a wider modernization effort. In March 2022, in light of Russia's invasion of Ukraine, Poland delayed a decision on new
Bell_AH-1Z_Viper
2005 video game
soundtrack and the ability to use both the Arwing and Landmaster at will during ground missions, but criticized its on-foot controls, short length and low lasting
Star_Fox:_Assault
Bullpup grenade launcher
War in Afghanistan in 2010, after which malfunctions and 2013 program budget cuts delayed official entry into service, planned for early 2017. In early
XM25_CDTE
Unmanned hypersonic experimental aircraft
portion of the Naval Air Station Point Mugu Sea Range caused a 24-hour delay. The X-51 completed its first powered flight successfully on 26 May 2010
Boeing_X-51_Waverider
U.S. Army prototype missile
December 2023. Harper, Jon (7 November 2023). "Army anticipates another delay in fielding Dark Eagle hypersonic weapon after detecting 'problem'". DefenseScoop
Long-Range_Hypersonic_Weapon
Moon exploration program by the Russian Federal Space Agency
Moon exploration program by Roscosmos meant to progress toward the creation of a fully robotic lunar base. When completed, the program is intended to continue
Luna-Glob
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
Girl/Female
Australian, Greek
The Mythological Mother of Perseus by Zeus; Form of Danae
Male
Hebrew
 Variant spelling of Hebrew Delayah, DELAYA means "God has drawn."
Surname or Lastname
English
English : unexplained. There are four farms so named in Warwickshire, one in Oxfordshire, and one in Worcestershire, and the surname is most probably derived from one of these.
Surname or Lastname
English (chiefly West Midlands)
English (chiefly West Midlands) : nickname for a plump person, from Middle English, Old French rond, rund ‘fat’, ‘round’ (Latin rotundus).
Girl/Female
German, Swedish
From the Elder Grove
Girl/Female
Australian, British, English, German
Noble; Nobility
Boy/Male
Norse
Son of Hrafn the Foolish.
Boy/Male
Norse
Son of Thori.
Girl/Female
German
Noble Protector
Boy/Male
Hindu
Dhayan
Surname or Lastname
English
English : patronymic from Round.
Girl/Female
Greek
Form of Danae; the mythological mother of Perseus by Zeus.
Boy/Male
Irish
Competitor's child; from the river Slaney.
Surname or Lastname
English
English : unexplained. Compare Grounds.Perhaps an Americanized form of German Grund.
Surname or Lastname
English (Devon)
English (Devon) : variant of Brand 1.
Surname or Lastname
English and Irish
English and Irish : variant spelling of Delaney.
Boy/Male
Native American
He is so.
Girl/Female
Swedish
Defender of man.
Boy/Male
French
Of the King.
Surname or Lastname
English (chiefly Lancashire)
English (chiefly Lancashire) : probably a Middle English metathesized form of the Old French personal name Gondri, Gundric (see Gundry).
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
Male
Dutch
, from Lucania.
Girl/Female
Australian, Hebrew, Irish
God's Oath; Noble; Kind; Of the Noble Sort; Form of Elizabeth
Surname or Lastname
English
English : variant spelling of Perrin.
Boy/Male
Hindu, Indian, Punjabi
Infinite; Great; Best; Endless
Boy/Male
Indian, Sanskrit
Lamp's Pathway
Girl/Female
Indian
Respect
Girl/Female
Arabic, Hindu, Indian, Muslim
Lucky Number; Stone; Metal; Colour
Male
English
Anglicized form of Irish Gaelic Donnchadh, DONAGHY means "brown warrior."
Male
Romanian
Pet form of Romanian Vasile, VASILICA means "king."
Girl/Female
Hindu
Art, Phases of Moon
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
GROUND DELAY-PROGRAM
v. t.
To lay again; to lay a second time; as, to relay a pavement.
superl.
Whole; unbroken; unharmed; free from flaw, defect, or decay; perfect of the kind; as, sound timber; sound fruit; a sound tooth; a sound ship.
n.
A supply of horses placced at stations to be in readiness to relieve others, so that a trveler may proceed without delay.
v. t.
To lay, set, or run, on the ground.
n.
Cause of decay.
n.
Any definite portion of the earth's surface; region; territory; country. Hence: A territory appropriated to, or resorted to, for a particular purpose; the field or place of action; as, a hunting or fishing ground; a play ground.
v. t.
To cause to decay; to impair.
v. t.
To connect with the ground so as to make the earth a part of an electrical circuit.
prep.
On every side of, so as to encompass or encircle; around; about; as, the people atood round him; to go round the city; to wind a cable round a windlass.
pl.
of Delay
imp. & p. p.
of Ground
n.
Gradual failure of health, strength, soundness, prosperity, or of any species of excellence or perfection; tendency toward dissolution or extinction; corruption; rottenness; decline; deterioration; as, the decay of the body; the decay of virtue; the decay of the Roman empire; a castle in decay.
v. t.
To found; to fix or set, as on a foundation, reason, or principle; to furnish a ground for; to fix firmly.
n.
An assembly; a group; a circle; as, a round of politicians.
v. t.
To cover with a ground, as a copper plate for etching (see Ground, n., 5); or as paper or other materials with a uniform tint as a preparation for ornament.
imp. & p. p.
of Grind
v. i.
To run aground; to strike the bottom and remain fixed; as, the ship grounded on the bar.
adv. & a.
On the ground; stranded; -- a nautical term applied to a ship when its bottom lodges on the ground.
a.
Built with groins; as, a groined ceiling; a groined vault.
v. i.
To pass gradually from a sound, prosperous, or perfect state, to one of imperfection, adversity, or dissolution; to waste away; to decline; to fail; to become weak, corrupt, or disintegrated; to rot; to perish; as, a tree decays; fortunes decay; hopes decay.